YJCNC
Menu
Request a Quote

CNC machining for aerospace supply chains

AS9100D Certification and CNC Machining

We provide custom CNC milling, turning, turn-mill, and Swiss-type machining for drawing-based components. Our quality management systems include AS9100D / EN 9100:2018, ISO 9001, ISO 14001, ISO 13485, and IATF 16949, each with its own stated scope.

For aerospace-related enquiries, we review the applicable drawings, purchase terms, and quality requirements before confirming whether a project fits our capabilities and certification scope. Certification alone does not qualify us for every aerospace program: each order remains subject to customer approval and applicable requirements.

Submit an aerospace RFQ
AS9100D / EN 9100:2018 Bureau Veritas certificate for Shenzhen Yijin Hardware Co., Ltd.

Review before order confirmation

We compare the drawing and revision, customer terms, quality clauses, and our current certification scope and manufacturing capability before confirming fit.

Certificate verification

Current AS9100D / EN 9100 certificate details

The details below are taken from the Bureau Veritas Certificate of Approval for Shenzhen Yijin Hardware Co., Ltd. The certificate covers BS EN ISO 9001:2015 and EN 9100:2018 (technically equivalent to AS9100D). Request a copy when you need the full document for supplier qualification.

Match the printed scope and site to your aerospace programme requirements before assuming coverage.

Certificate detail Verification
Certified legal entity Shenzhen Yijin Hardware Co., Ltd.
Address on certificate Room 301, Building 11, Houde Logistics Park, Bao'an District, Shenzhen City, Guangdong Province, China 518104
Standards BS EN ISO 9001:2015 and EN 9100:2018 (technically equivalent to AS9100D)
Certification scope Design, development and production outsource of civil aircraft mechanical parts facilities and filter; design, development and manufacture of civil aircraft mechanical parts product
Certificate number CN044900
Validity period Original ASCS approval / issue: 19 Sep 2023; Expiry: 18 Sep 2026
Certification body Bureau Veritas Certification Holding SAS – UK Branch; UKAS 0008; ADS/ascs
We can provide available certification information for supplier review. Tell us if you also need a verification record, audit questionnaire, or other documentation.

How we manage requirements

A quality-system framework for applicable work

For projects within our confirmed certification scope, we use our quality management system to manage production and inspection in line with applicable requirements. We review customer-specific terms alongside the drawing before accepting an order.

01 / Risk and requirements

Review the part and its terms

We assess the drawing, revision, technical specifications, inspection criteria, and purchase clauses. If a requirement is unclear or cannot be confirmed, we raise it for review before proceeding to help identify risks affecting manufacturability, verification, or delivery.

02 / Configuration and change

Work to agreed revisions

We use the customer-approved drawing and agreed order requirements as the production basis. Changes to a drawing revision, specification, or other requirement should be reviewed and agreed before affected work proceeds. Include your change-control instructions in the RFQ so we can assess their application.

03 / Product conformity

Match inspection to the part

Our dimensional inspection resources include a coordinate measuring machine, optical measuring systems, height measuring instruments, concentricity measurement, surface roughness testing, hardness testing, and dimensional gauges. Methods and records depend on part features and customer requirements. Specify key characteristics, acceptance criteria, inspection frequency, and required deliverables such as reports.

04 / Materials and supplier quality

Confirm documentation expectations

Material identification, traceability records, and supplier-related controls may depend on customer and order requirements. We do not assume a particular material certification, traceability format, or supplier approval status. Share applicable clauses and documentation expectations so we can confirm what can be supported before order placement.

Manufacturing capabilities

CNC machining for varied component geometries

Our equipment supports a range of part forms and production needs. Listed machine precision is not a guaranteed tolerance for every part; achievable tolerances depend on geometry, material, feature relationships, machining method, and inspection requirements. We review these factors against your drawing before confirming a quotation.

CNC milling

25 three-axis machines, one four-axis machine, and eight 5-axis CNC machines. Examples include brackets, housings, mounting plates, and multi-sided components.

CNC turning

43 CNC lathes, plus gang-type and automatic lathes, for shafts, sleeves, bushings, connectors, and other turned parts.

Turn-mill

15 machines for components combining turned and milled features.

Swiss-type machining

10 Swiss-type lathes, including five-axis and six-axis machines, for small or slender components.

Supporting operations

Screw machines, conventional milling machines, and small surface grinders.

Supplier assessment

What to include in an aerospace RFQ

The more complete the order requirements, the better we can assess fit and provide a useful response. Specific orders must meet the applicable customer technical specifications and supplier-entry requirements.

We review those requirements alongside our current certification scope and manufacturing capability before confirming whether we can support the work.

  • Latest part drawing and revision level
  • Applicable material, process, and product specifications
  • Purchase terms and customer-specific quality clauses
  • Material documentation and traceability expectations
  • Key characteristics, tolerances, and inspection criteria
  • Required inspection records and other deliverables
  • Prototype or production quantities and expected order frequency
  • Supplier qualification, audit, or approval requirements
Share your RFQ requirements

Common supplier review questions

Clarify scope, approvals, and order requirements

Does AS9100D certification automatically qualify us for an aerospace program?

No. Certification alone does not establish approval for every program. Each order remains subject to customer approval, applicable technical specifications, supplier-entry requirements, and confirmation that the work fits our current certificate scope and capabilities.

Can you confirm the certificate entity, scope, validity, and certification body?

Those details are not stated in the company information provided here. Please request our current certificate; it is the authoritative source for the certified legal entity, scope, certificate number, validity period, and certification body.

Can you provide the inspection and material records our order requires?

Requirements vary by part and order. Send the applicable acceptance criteria, inspection deliverables, material documentation, and traceability clauses with your RFQ so we can review what can be supported before order placement.

Discuss your requirements

Send your drawings and quality requirements for review

Share your drawings, purchase terms, and quality audit requirements. We can review the machining approach, inspection expectations, and certification documentation relevant to your enquiry.

We will assess your requirements against the current certification scope and manufacturing capability before confirming whether we can support the work.

Start a supplier assessment or machining quotation

Please include the latest drawing revision, applicable purchase clauses, and any quality audit or documentation requirements.